Categories
Hull Assembly

Buttoning up the Bow

Before the final hull side pieces can go on I need to install the bow deck. This means I need to get the forward compartment filled with foam, bow eye ready for install, and then get as much work complete in the forward storage area as I can before the space gets really cramped. Forward […]

Categories
Hull Assembly

Floors & Bulkheads, Pt.3 – Tack Welding

All the pieces are stitched in and are all level, flush, plumb, etc., etc. Or…as much as they’re going to get at least. Now to start tack welds. Before starting to glue, I got on the floor and taped up all cracks and holes from which epoxy might escape. Easier said than done to say […]