I hit quite a stall during Christmas and haven’t gotten much done in a while. It’s that bilge. The thought of sanding all those nooks and crannies multiple times I think just ran me down. I did however get all my floorboards ready for install as that part was fairly easy and so more fun […]
Tag: floors
Floorboards, Pt.2
In the last post I described what I am going for and how I made sure I had enough sq.ft. of board coverage (length and width). For how I want my sole to look and lay out, there was not enough area with the boards that were included in the kit. To get more coverage, […]
Glassing the Bilge, Pt.1
Having a good place to spread out and get fiberglass off the roll has always been troublesome. I have seen a recommendation to set up a bar for the roll to hang on for spooling off the glass sheeting (Doug Braun maybe?). I rigged one of these up and after cutting fiberglass for half the […]
Floors & Bulkheads, Pt.4 – Fillets
With all the tack welds in place it’s time to remove all the stitches and lay down large continuous fillets at all the seams. Prep Removing the stitches is fun. Seeing everything held together and standing on its on is satisfying. Just 1,517 more steps to go. Though I had cleaned my tack weld fillets […]
Before applying the initial ‘tack weld’ fillets, all the floors and bulkheads need to be squared up and leveled. As my shop floor isn’t perfectly level I first had to mess around with leveling the cradle itself. Then I stitched in the remaining floors and bulkheads (except for floor 3, more on that later). All […]
With the bottom hull panels now fully stitched to the keelson and to each other at the bow, the floors and bulkheads can go in. First, floor 4 & bulkhead 7 are fit and glued to the centerboard trunk. Those pieces fit to the trunk in just one way, and they will serve as good […]