With all the tack welds in place it’s time to remove all the stitches and lay down large continuous fillets at all the seams. Prep Removing the stitches is fun. Seeing everything held together and standing on its on is satisfying. Just 1,517 more steps to go. Though I had cleaned my tack weld fillets […]
Tag: bulkheads
All the pieces are stitched in and are all level, flush, plumb, etc., etc. Or…as much as they’re going to get at least. Now to start tack welds. Before starting to glue, I got on the floor and taped up all cracks and holes from which epoxy might escape. Easier said than done to say […]
Before applying the initial ‘tack weld’ fillets, all the floors and bulkheads need to be squared up and leveled. As my shop floor isn’t perfectly level I first had to mess around with leveling the cradle itself. Then I stitched in the remaining floors and bulkheads (except for floor 3, more on that later). All […]
With the bottom hull panels now fully stitched to the keelson and to each other at the bow, the floors and bulkheads can go in. First, floor 4 & bulkhead 7 are fit and glued to the centerboard trunk. Those pieces fit to the trunk in just one way, and they will serve as good […]
The Wilderness
This post is being written on May 11, 2023. Since early January my build has been all over the place. My keel was ready to go and my spars were all cut and sanded, ready for epoxy and varnish. My spars were taking up the room I needed to build the hull, so I was […]